Airport MINI of Cleveland

  • Size: 14,425 SF
  • Total Construction Duration: 4 Months

Markets Back to Top

Automotive Campus

Location Back to Top

Ohio

Partners Back to Top

Independence Construction
Design-Builder
Collection Auto Group
Owner
Vocon
Architect
I.A. Lewin P.E. and Associates
Structural Engineer
WHS Engineering
Mechanical Engineer
Neff & Associates
Civil Engineer

Summary Back to Top

This project consisted of a one-story auto dealership on a 3.6 acre parcel of land in Brook Park, Ohio, containing a shared 265 parking space sales lot. The facility includes a 6-Vehicle Showroom, 4-Vehicle Service Drive, 7-Bay Service Area, 3-Vehicle Detail Bay, Parts Storage Mezzanine, Training Room, and a 9-Office Sales Department.

The site includes a fully underground retention structure. The building envelope consists of a structural steel frame and half height masonry in the service area of the building. The exterior facade includes a combination of EIFS and aluminum composite panels. Large glass windows also create much of the sales area exterior facades.

The majority of this facility has open painted ceilings and contains many brand-specific finishes, including millwork and tile flooring throughout the entire facility including the service drive and service areas.

Galleries Back to Top